Inter Miami eradicated, Liverpool prolong lead on the prime & David Coote suspended!

Christian Polanco and Alexis Guerreros react to a busy weekend within the MLS playoffs together with the surprising elimination of Inter Miami on this episode of The Cooligans.

Christian and Alexis then break down the most recent ends in the Premier League that helped Liverpool develop their lead on the prime of the desk.

Later, Christian and Alexis break down the NWSL playoffs. In addition they react to the viral video that has gotten Premier League referee David Coote suspended indefinitely.

(5:35) – Inter Miami eradicated from MLS playoffs

(23:40) – NYCFC defeat FC Cincinnati

(30:10) – Orlando Metropolis defeat Charlotte FC

(37:24) – Manchester Metropolis lose 4th sport in a row

(43:36) – Liverpool win, sit prime of PL desk

(46:55) – Arsenal draw Chelsea

(52:30) – Violence breaks out at Europa league match

(1:00:21) – NWSL playoffs recap

(1:11:38) – Premier League droop referee David Coote

Related posts

NWSL Matchweek 15: High targets and saves

Match overview: Utah Royals FC journey 4 second-half objectives in victory over Portland

Gotham FC’s Emily Sonnett has season-ending surgical procedure placing World Cup doubtful